Triangle Construction managed theĀ 48,000 SF design-build project took took 18 months to design and construct. The school was designed to be efficient to construct and fit into the current campus architecture at Greenville Technical College’s Benson Campus. The building features an open dining area as well as covered porches overlooking a preserved wooded area. The building houses classrooms for 425 students and includes science classrooms and a multi-purpose room.